Issue :DTP data not delivered to ETL tool

$
0
0

Hi Friends,

 

I faced an issue in my project .Request your suggestions in this scenario.


Due to the memory issues many of the DTP got aborted in the system during regular load timings in production.

 

In some of the DTP aborts whole data package got aborted for which we did complete rerun of the DTP
But in some DTP cases only one some of the data package got failed.

 

So I have a example to share for the fix I did to the correct the DTP in my project.


This DTP loads data from a DSO to Openhub .This openhub deliveres data directly to ETL.

This DTP had 15 data packages and only one datapackage was in error(having 50000 records) rest all data pacakges were green (time 21:36).

So as we were facing memory issues in the system, instead of repeating the whole DTP; I repaired only the failed datapackage using the ''Post processing error data packages manually'' option in DTP which we get only if there is any failed datapackages.


As soon as I did it, it the failed datapackage was green and the whole DTP went successful.

 

But next day ETL reported saying that thy received only the last datapackage containing 50k records which I get corrected last night (time 21:39).

 

So my question is why did ET(Informatica)L receive only the last data package from BW even though all datapackages were green and DTP was competed successfully at 21:39 in SAP BW.

Is the post processing option provided in the system by SAP is not fit to use.?

 

One more point I like to share is the DTP I repaired by deleting the bad request and repeating the whole DTP step was successful and all data records were delivered to ETL, then what would have went wrong in this case.??

 